Skip to content

Every part of the job, in one job file

From the first survey to the customer's handover pack. Each page shows the real screens, on made-up demo jobs.

  1. Step 1SurveyA phone survey in six short groups, from the bill to the scaffold, that feeds the design and the quote.Six short groups, about 15 minutes on siteThe supplier and tariff start the quote's savingsAnything to check later is listed, not lost6 steps, from start to finish
  2. Step 2DesignDraw the roof on the aerial photo, fill it with panels, plan the scaffold and see the shade in 3D, then quote from the same screen.Roof and panels on the aerial photoThe scaffold planned side by side, in 3DShade from trees and next door, in 3D7 steps, from start to finish
  3. Step 3Equipment and pricesOne list of every panel, inverter, battery and charger, each with one price, preloaded with the manufacturers' figures.One card and one price for each productWarranties from the manufacturers' own termsBlank figures filled in one press6 steps, from start to finish
  4. Step 4ProposalsQuotes from your price book, a customer proposal page and PDF, and signing on the customer's phone.Quotes from your own price bookA proposal page and PDF in your brandSigned on the customer's phone6 steps, from start to finish
  5. Step 5Scheduling and customer updatesBook every visit in one calendar. Customers get the booking, an On my way email and progress updates in your name.One calendar for every visitOn my way, with the arrival timeProgress emails and the portal in your name6 steps, from start to finish
  6. Step 6Engineers on siteToday's jobs, photos that upload when the signal allows, and the construction phase plan signed on the phone.Today's jobs, and nothing about moneyPhotos that wait for a signalThe construction phase plan signed on the phone6 steps, from start to finish
  7. Step 7DNO and ENAThe G98, G99 or G100 route worked out, the notice clock, and applications sent through ENA Connect Direct.G98, G99 and G100 worked out from the jobApplications sent through ENA Connect DirectNo G99 install booked before approval6 steps, from start to finish
  8. Step 8Commissioning and handoverTest readings on the commissioning sheet, certificates on the file, and the branded customer pack.Every test reading on one sheetHandover waits until the evidence is inA branded pack with a QR code6 steps, from start to finish

Free: the handover evidence checklist

A printable one-page-per-job PDF, from survey to final pack.

Get the checklist

See your next handover pack come together

Start a free trial, or book a 20-minute call and we will walk through a real job file with you.