Free solar and battery handover evidence checklist

One page per job, from survey to final pack. Print it for the van, or pin it in the office, and tick off the evidence as it is filed.

What is on it

  • Survey

    • Site survey record: roof, orientation, pitch, shading, access
    • Photos of the roof and the existing electrical installation (consumer unit cover on and off, meter, earthing)
    • and 2 more
      • Structural check recorded, and who assessed it where needed
      • Customer requirements agreed: layout, battery location, monitoring
  • Design and contract

    • System design: array layout, strings, inverter and battery
    • Performance estimate exactly as given to the customer
    • and 5 more
      • Network operator route worked out (G98 or G99) from the aggregate, including existing generation
      • G99 only: application sent and acceptance received before installation
      • Quote and contract, with the contract date (it sets the scheme track)
      • Pre-sale information given, and how and when
      • Cancellation period, or the customer's written request to start early
  • Before install

    • Construction phase plan issued for this site
    • Plan read and signed by everyone on site, before work starts
    • and 1 more
      • Any design change agreed by the customer in writing
  • Installation

    • Roof fixings and flashing, before and after the panels go on
    • Cable routes, entry points and fire stopping
    • and 3 more
      • DC and AC isolators, with labels
      • Inverter and battery, with labels and serial plates legible
      • Warning labels at the consumer unit, meter and isolators
  • Commissioning

    • Electrical installation certificate and test results
    • Commissioning record for inverter and battery, with settings
    • and 3 more
      • Test equipment in calibration on the day
      • Commissioning date recorded (it starts the certificate clock)
      • Generation meter reading photographed after commissioning
  • Handover

    • Technical handover: the customer knows how to use and isolate the system
    • MCS certificate for each technology, within the deadline for the job's track
    • and 5 more
      • Building regulations notification made, then the certificate filed
      • Network operator proof: G98 notification or G99 acceptance
      • Warranties, workmanship guarantee and manuals in the pack
      • Care, safe isolation, monitoring and contact details in the pack
      • Final pack given, and the date recorded

Written by Voltfile in our own words. It is a prompt, not a standard, and it is not an MCS document: check the current official documents for each job.

Get the checklist

We will show the download straight away and email you a copy of the link.

We use your email to send the checklist, and for news only if you tick the box. See the privacy notice.

Read alongside it

Want this checklist on every job?

Voltfile runs this checklist on every job, on your engineers’ phones, and holds handover until it is complete.