Free solar and battery handover evidence checklist
One page per job, from survey to final pack. Print it for the van, or pin it in the office, and tick off the evidence as it is filed.
What is on it
Survey
- Site survey record: roof, orientation, pitch, shading, access
- Photos of the roof and the existing electrical installation (consumer unit cover on and off, meter, earthing)
and 2 more
- Structural check recorded, and who assessed it where needed
- Customer requirements agreed: layout, battery location, monitoring
Design and contract
- System design: array layout, strings, inverter and battery
- Performance estimate exactly as given to the customer
and 5 more
- Network operator route worked out (G98 or G99) from the aggregate, including existing generation
- G99 only: application sent and acceptance received before installation
- Quote and contract, with the contract date (it sets the scheme track)
- Pre-sale information given, and how and when
- Cancellation period, or the customer's written request to start early
Before install
- Construction phase plan issued for this site
- Plan read and signed by everyone on site, before work starts
and 1 more
- Any design change agreed by the customer in writing
Installation
- Roof fixings and flashing, before and after the panels go on
- Cable routes, entry points and fire stopping
and 3 more
- DC and AC isolators, with labels
- Inverter and battery, with labels and serial plates legible
- Warning labels at the consumer unit, meter and isolators
Commissioning
- Electrical installation certificate and test results
- Commissioning record for inverter and battery, with settings
and 3 more
- Test equipment in calibration on the day
- Commissioning date recorded (it starts the certificate clock)
- Generation meter reading photographed after commissioning
Handover
- Technical handover: the customer knows how to use and isolate the system
- MCS certificate for each technology, within the deadline for the job's track
and 5 more
- Building regulations notification made, then the certificate filed
- Network operator proof: G98 notification or G99 acceptance
- Warranties, workmanship guarantee and manuals in the pack
- Care, safe isolation, monitoring and contact details in the pack
- Final pack given, and the date recorded
Written by Voltfile in our own words. It is a prompt, not a standard, and it is not an MCS document: check the current official documents for each job.
Get the checklist
We will show the download straight away and email you a copy of the link.
Read alongside it
HandoverWhat goes in a solar PV and battery handover packThe documents a homeowner should get, when they are due, and how to stop incomplete packs going out.Read more EvidenceMIS 3002 evidence: what to keep on every solar PV jobA stage-by-stage list of what a solar PV job file should hold, and how to capture it so it holds up later.Read more AssessmentPreparing for an MCS assessment: a practical planA four-week plan: job files, company records, procedures, and what to have open on the day.Read more