The problem
Why a generic template is not enough
A plan copied from the last job still says the scaffold is on the south elevation and the isolator is in the garage. That is worse than no plan: it looks right and it is not.
Getting it signed is the other problem. Paper sign-on sheets get wet, lost, or signed after the job.
How Voltfile helps
What you get on every job
- Built from the jobThe plan pulls the address, dates and people from the job and asks the site questions that matter: access, scaffold, fragile surfaces, isolation point, battery location and lifting, emergency arrangements.
- Only what appliesScaffold questions only when there is a scaffold, the asbestos check only for older buildings, battery hazards only on battery jobs. Hazards left out need a reason.
- Read and sign on a phoneEach person reads the plan in sections and signs with a finger. One phone can record several people. Daily pre-start checks and toolbox talks sit alongside.
- Install stays lockedUntil the plan is issued and signed, the install stage on the job is locked. Change the plan and it needs signing again.
What it does not do
- The starting wording was written for this product; it is not HSE text and it is not a legal opinion. Review it with a competent person before you use it.
- It does not replace your risk assessments and method statements. It links hazards to your own method statements.
FAQ
Common questions
Do domestic solar installs really need a construction phase plan?
CDM 2015 requires a construction phase plan for every construction project, including domestic ones. Check the HSE guidance for how the client duties pass to the contractor on domestic work.
Can subcontractors sign the plan?
Yes. Subcontractors from your register can be added to the plan and sign on the same phone, with their company name recorded beside their signature.
Guides on this topic
Health and safetyConstruction phase plans for domestic solar installsHow CDM 2015 applies on domestic jobs, what a proportionate plan covers, and how to get it signed.Read more AssessmentPreparing for an MCS assessment: a practical planA four-week plan: job files, company records, procedures, and what to have open on the day.Read more
Related
SolutionBattery installation paperworkBattery storage jobs add pre-sale, location, fire, DNO and certificate paperwork. Keep it on one checklist with its own deadlines, beside the solar PV file.Read more SolutionJob management for solar installersJob management built around the solar job file: book engineers, capture evidence on site even offline, see what blocks each job, and hand over in one click.Read more SolutionMCS audit preparationPrepare for your MCS assessment with complete job files: evidence filed by stage and clause label, records up to date, and one zip per job for the assessor.Read more
Free: the handover evidence checklist
A printable one-page-per-job PDF, from survey to final pack.