How it runs on a job
What the installer does, step by step
Step 1: Open the survey from the job
The customer's name, address and job reference come across from the job, and the roof sides found on the map are ready to check. The engineer starts on the house, not on typing.
Step 2: Customer and bill
Who they spoke to and the meter number from the bill, which is checked and gives the network operator. Then who supplies the electricity and which tariff, picked from tiles, with today's price for the customer's area wherever our tariff list has it.
Step 3: The house and the roof
The type of house, the storeys and any planning limits. Each roof side from the map is confirmed or changed, with its construction, condition and rafter size. Tiles, battens and the rest sit under More detail.
Step 4: The supply and where the equipment goes
The supply, the main fuse, earthing and what is already in the house, with photos. Then the spot for the inverter and battery, power-cut backup and the cable length, which sets the cable line on the quote.
Step 5: Access and photos
How the crew gets up, which sides need scaffold and anything in the way, the house photos and a sketch. A full scaffold picks the scaffold line on the quote, and what is in the way reaches the design's Scaffold step.
Step 6: Send it to the office
Anything that can't be checked on the day goes under Confirm later, with when it is needed. Send to the office, even with no signal: it goes when the phone is back online. The office accepts it and starts the design, or sends it back with a note.
The supplier and tariff, straight into the savings
On the first group the engineer taps who supplies the customer's electricity, then their tariff. Each tariff tile shows today's price for the customer's area, from our published tariff list for Great Britain. Economy 7, Economy 10, Other and Not sure are always there.
When the quote opens, Energy starts from that tariff's price, with a note saying it came from the survey. Anything typed on the quote always wins, and a sent quote never changes.
- The six best-known suppliers first, then the rest on our list
- Other opens a box to type the name from the bill
- Not sure is always allowed, and shows under Confirm later
The office review, then the design pack
The office review shows every answer and photo in one place. It lists what is still to confirm and the follow-ups to chase, each with Mark done.
Accept the survey and the design starts, with the design pack built from the same answers: a PDF and a zip the designer can work from, with roof bearings written the way OpenSolar and Easy PV both expect. The scaffold brief is a page you can print, or save as a PDF for your scaffolder.

What ends up on the job file
Kept on the job with the rest of its evidence, where your office and your assessor can find it.
- Every answer and photo, with what is still to confirm and when it is needed
- A follow-up for the office for anything still to confirm
- The customer's supplier and tariff, for the quote
- The survey design pack PDF: roof faces, the supply and fuse board, cable lengths, the photo list and the sketch
- The scaffold brief, ready to print or save as a PDF
- The network operator, worked out from the meter number or the postcode
The screens on this page are a made-up demo company, Copperwick Solar, with made-up jobs and customers.
The survey screens on this page are working copies of the app's own, on a made-up demo job with made-up tariff names and prices.
FAQ
Common questions
Can we change the survey questions?
Yes. The survey form, its pick lists and its rules are set per company in Settings.
Does the design use the survey?
Yes. The roof sides, the supply, the cable run and the scaffold answers from the survey are on the job when the design starts.
What if the customer's tariff isn't listed?
Pick Other and type the name from the bill, or Not sure. The quote then starts from today's default prices, and you change them on the quote.