The MCS:2025 transition: a guide for solar installers

What changes for UK solar PV and battery installers moving to MCS:2025: documents, certificate windows, customer paperwork, and jobs that straddle the move.

Updated 7 minute read

MCS:2025 is the revised MCS scheme. Installers move over on a date agreed with their certification body, and for a while you will have some jobs on the previous scheme and some on MCS:2025 at the same time. That overlap is where mistakes happen, so this guide focuses on what differs between the two tracks and how to keep each job on the right one.

Your move-over date is the key date

Every job should follow one track from start to finish. The simplest rule, and the one most installers use, is to set the track from the contract date:

  • contracts signed before your move-over date stay on the previous scheme;
  • contracts signed on or after it follow MCS:2025.

Write your move-over date down somewhere everyone can see it, and record the track on each job. If you ever change a job's track by hand, note why. An assessor looking at a job from the overlap period will want to know which documents you followed.

Which documents change

The installation and product standards were reissued for MCS:2025, and the consumer-facing documents changed too. In summary:

AreaPrevious schemeMCS:2025
Solar PV installation standardMIS 3002 (version 6.0 on the previous scheme)MIS 3002:2025
Battery storageMIS 3012 (the 2021 issue)MIS 3012:2025, with battery pre-sale in MCS 032:2025
Consumer protectionMembership of a consumer code such as RECC or HIESThe MCS Customer Commitment, with financial protection recorded

Two practical consequences:

  1. Clause references change. If your checklists, method statements or quote templates quote clause numbers, they need a version for each track. A photo labelled against the old clause is still good evidence, but an assessor will expect the label to match the track the job followed.
  2. Consumer paperwork changes. Your terms, deposit handling and cancellation wording may have been written around a consumer code. Review them against the Customer Commitment before your first MCS:2025 contract, especially if you take deposits.

Certificate and customer document deadlines

The biggest day-to-day change is timing.

  • Previous scheme: the MCS certificate has to be registered within a set number of working days of commissioning. Count working days properly: weekends and bank holidays do not count.
  • MCS:2025: the certificate window is counted in calendar days from commissioning, and there is a separate deadline for giving the customer their key documents (the MCS certificate, the building regulations certificate and proof that the network operator has been told).

A PV and battery job has two certificates, and each has its own clock. Put both on the job the day you commission.

A transition checklist

Work through this before your move-over date:

  • Confirm your move-over date with your certification body, in writing.
  • Get the current issue of each MCS:2025 document from the official library, and note the issue numbers in your procedures.
  • Update checklists and templates so each track has its own clause labels.
  • Review quotes, contracts, deposit terms and cancellation wording against the Customer Commitment.
  • Brief engineers and the office on the new certificate and customer document deadlines.
  • Decide how you will mark each job's track, and who can change it.
  • Ask your certification body about jobs that straddle the move, and write down the answer.
  • Check your MCS battery scope if you install storage.

How Voltfile handles it

In Voltfile, you record your move-over date once. Each new job is set to a track from its contract date, the checklist and clause labels follow that track, and the certificate and customer document deadlines are counted for you. Changing a track needs a reason, which goes in the job history. When the assessor asks, the job file and assessor zip show which track each job followed.

Voltfile does not decide which rules apply to your business. Your certification body and Technical Supervisor do.

Official sources

Always check the current version before relying on a date, a threshold or a form.

Free: the handover evidence checklist

A printable one-page-per-job PDF, from survey to final pack.