The problem
Why handover packs go wrong
The pack is usually the last job of the week. The details it needs are spread across a design PDF, a commissioning sheet, a DNO email and a photo of the inverter label, so it gets written from memory or from the last job’s template.
That is how a pack ends up with the wrong panel count, a missing certificate number, or a note that the DNO has been told when nobody has sent the form yet.
How Voltfile helps
What you get on every job
- Filled from the job fileSystem size, panel and inverter details, battery, test results and references come from the items your engineers and office filed. Nothing is typed twice.
- Two stages, two packsTechnical handover is available once every required technical item is in. The final pack follows when the MCS certificate, the building regulations certificate and the network operator proof are filed.
- Your brand, not oursYour logo, colours and contact details on the cover, with a QR code to the homeowner’s online copy in the customer portal.
- Evidence stays privateAssessor-only evidence, such as roof photos and internal notes, stays in the job file and the assessor zip. The homeowner sees what is theirs.
What it does not do
- It does not write the MCS certificate or submit it for you. You raise it through your certification body and upload the copy.
- It works out the MCS performance estimate only with the new proposal look, which is in beta. Without it, upload the one from your design tool.
- It does not declare the installation meets any standard. Your Technical Supervisor does that, and every pack says so.
FAQ
Common questions
Can I use my own handover pack layout?
The pack has a fixed structure so nothing is missed, but it carries your name, logo, colours and contact details. Company documents such as warranties and care guides can be attached from your document library.
What happens if something is still missing?
The handover button stays disabled and the job page lists exactly which required items are still open, so the office can chase them before the customer is waiting.
Does the homeowner get a copy online?
Yes. Once the job is handed over, the homeowner can log in with an email link to download the pack, certificates and warranties, and report a problem.
Guides on this topic
Related
Free: the handover evidence checklist
A printable one-page-per-job PDF, from survey to final pack.
