MIS 3002 evidence: what to keep on every solar PV job
A stage-by-stage list of the evidence a solar PV job file should hold under MIS 3002, from survey to aftercare, with practical tips for photos and records.
Updated 8 minute read
MIS 3002 is the MCS installation standard for solar PV. It says what an installer must do. This guide is about the other half: what you keep to show you did it. It is written from an installer's point of view and does not reproduce the standard. Use it alongside the current issue, not instead of it.
The principle: one file per job, filed by stage
An assessor sampling a job wants to follow it from first visit to handover without asking where things are. The easiest way to make that possible is to file evidence against the stage it belongs to, with a label that says what it proves. A folder called "Photos" with 140 images in it is evidence. It is just not findable evidence.
For every item, ask: if I were not here, could someone else see what this proves?
Survey
- Site survey record: the roof, orientation and pitch, shading, access, and the condition of the structure as seen.
- Photos of the roof and the existing electrical installation, including the consumer unit, the meter position and the earthing arrangement.
- Structural considerations: what you checked and, where needed, who assessed it.
- Customer requirements you agreed, such as panel layout preferences, battery location and monitoring.
Tip: photograph the consumer unit with the cover on and off. It saves a second visit when the designer has a question.
Design and pre-sale
- System design: array layout, string design, inverter and battery selection.
- Performance estimate in the format the standard requires, from your design tool. Keep the exact document the customer received.
- Network operator route (G98 or G99), and for G99, the application and acceptance. See G98 vs G99.
- Quote and contract, with the date the contract was signed. The contract date decides the job's scheme track.
- Pre-sale information given to the customer, and how and when it was given.
- Cancellation period and, if the customer asked you to start early, their written request.
Before install
- Construction phase plan, issued and signed by the people on site. See construction phase plans for solar.
- Any design change since the contract, and the customer's written agreement to it.
Installation
Photos are the core of this stage. Take them as you go, not at the end, because a finished roof hides most of what matters.
- Roof fixings and flashing, before and after the panels go on.
- Cable routes, entry points and fire stopping where cables pass through.
- DC and AC isolators, and their labels.
- The inverter and battery, with their labels and serial plates legible.
- Warning labels at the consumer unit, the meter and the isolators.
- The generation meter, and its reading after commissioning.
Tip: keep the time and location on photos. It answers "when was this taken?" before anyone asks.
Commissioning and testing
- Electrical installation certificate and schedule of test results.
- Commissioning record for the inverter and battery, including settings where relevant.
- Test equipment used, and that it was in calibration on the day.
- Commissioning date. It starts the certificate clock, so record it once and do not change it without a reason.
Handover and after
- MCS certificate, raised within the deadline for the job's track.
- Building regulations notification, and later the certificate.
- Network operator proof: the G98 notification or G99 acceptance.
- Handover pack as given to the customer, and the date it was given. See what goes in a handover pack.
- Aftercare: complaints, call-backs and feedback, logged against the job.
Common gaps assessors find
- The generation meter photo was taken before commissioning, so it shows zero.
- The performance estimate on file is not the version the customer was given.
- The design changed on the day, and there is nothing in writing from the customer.
- The job was handed over before the building regulations notification was made.
- Photos exist, but nobody can say which job, or which roof, they belong to.
How Voltfile helps
Voltfile gives every job this structure as a checklist, with photo, file, reading and reference items filed by stage and labelled for the job's track. Engineers capture on their phone, even with no signal. Some impossible answers are refused, such as a certificate raised before commissioning or a generation meter photo taken too early. Handover stays locked until every required item is done or marked not applicable with a reason. When you are preparing for an assessment, each job exports as one indexed zip.
Voltfile shows how complete your evidence is. It does not judge whether the work meets the standard; your Technical Supervisor does.