An MCS assessment by your certification body checks that your business works the way the scheme expects, and that your installations show it. Assessors typically look at a sample of recent jobs and at your company records. None of this should be new work. The aim of preparing is to make what you already do easy to see.
Four weeks out
Pick your own sample first
Choose five recent jobs across the technologies you install, for example PV only, PV and battery, and a battery retrofit. Open each one and check you can find, in under a minute each:
- the survey, the design and the performance estimate the customer was given;
- the contract date, and which scheme track the job followed;
- the construction phase plan, signed before work started;
- installation photos: fixings, flashing, cable routes, isolators, labels;
- the electrical installation certificate and test results;
- the MCS certificate, raised within the deadline for the track;
- the building regulations notification and certificate;
- the network operator proof;
- the handover pack as given, and when it was given.
If anything takes longer than a minute to find, the assessor will notice too. Fix the filing now, not on the day.
Check your company records
- Technical Supervisor: who they are, their qualifications, and that they were in date on every job's commissioning day.
- Training records for installers, with certificates.
- Subcontractors: who you used, their competence, insurance in date, and your agreement with them.
- Test equipment: calibration certificates in date.
- Complaints: every complaint logged, acknowledged and resolved, with the customer told where to go if they are unhappy.
- Customer feedback, and what you did with it.
Two weeks out
Review your procedures
Read your quality procedures as if you were new to the business. Do they describe what you actually do? The most common procedure findings are not bad practice. They are procedures that describe a process nobody follows any more.
- Update anything that changed with the MCS:2025 transition.
- Check each document shows its version, its review date and who approved it.
- Make sure staff have read the policies that apply to them, and that you can show it.
Close the gaps you found
Upload the missing photos you can still get, chase the certificates and DNO acknowledgements, and log the complaint that was sorted by phone but never written down.
The week before
- Confirm the date, time and format of the assessment, on site or remote.
- Decide who will sit with the assessor: usually the Technical Supervisor and whoever runs the office.
- If an installation will be witnessed, check access with the customer and brief the team.
- Have your job files and company records open and ready to share on screen.
On the day
- Answer the question asked, and show the evidence. "Here it is" beats a long explanation.
- If you cannot find something, say so, note it, and follow up. Guessing makes it worse.
- Take notes of anything the assessor raises, in their words.
After the assessment
Your certification body will tell you about any findings and how long you have to close them. Treat each one as a process fix, not a one-off: if a photo was missing on one job, change the checklist so it cannot be missed on the next.
How Voltfile helps
Voltfile is built for exactly this. Each job's evidence is filed by stage and clause label, and each job exports as one indexed zip for the assessor: see MCS audit preparation. Registers for Technical Supervisors, training, subcontractors and complaints warn before entries expire. The document library tracks versions, approvals, staff sign-off and review dates. The evidence guide lists what each stage should hold.
Voltfile cannot tell you whether you will pass. It shows how complete your evidence is, so you can spend the four weeks fixing gaps instead of finding them.
Official sources