Skip to content

Handover

What goes in a solar PV and battery handover pack

What a homeowner handover pack for a solar PV and battery install should contain, when it is due, and how to stop incomplete packs going out.

Updated 6 minute read

The handover pack is the part of the job the customer keeps. It is also the first thing they reach for when their energy supplier asks for a certificate, when they sell the house, or when something goes wrong. A good pack saves you phone calls for years. A rushed one creates them.

What a complete pack contains

About the system

  • A plain summary: what was installed, where, and when it was commissioned.
  • Equipment details: panel make, model and quantity; inverter; battery and its usable capacity; optimisers; monitoring.
  • The performance estimate the customer was given at the point of sale, unchanged.
  • A simple diagram or photo showing where the isolators, inverter, battery and meter are.

Certificates and approvals

  • MCS certificate for each technology. A PV and battery job has two.
  • Electrical installation certificate and test results.
  • Building regulations certificate from your competent person scheme, or the notification reference while the certificate is on its way.
  • Network operator proof: the G98 notification or the G99 acceptance.

Looking after it

  • Safe isolation: how and when to switch the system off, in plain English.
  • Maintenance: what the customer can do, what needs a professional, and how often.
  • Monitoring: how to log in, and what normal looks like.
  • Manufacturer manuals for the inverter, battery and any other equipment.

Guarantees and support

  • Product warranties and how to claim, including the manufacturer's registration if you registered on the customer's behalf.
  • Workmanship warranty and any insurance-backed guarantee.
  • Who to contact, including out of hours if you offer it.
  • Your complaints procedure, and where the customer can go if they are not happy with how you handle a complaint.

Money

  • Smart Export Guarantee: a short note that the customer can apply to an SEG licensee, and that they will usually need the MCS certificate to do so.

Timing: two stages, not one

In practice a handover happens in two steps, and treating it as one causes most incomplete packs.

  1. Technical handover on or soon after commissioning. The system is working, the customer knows how to use and isolate it, and they have the test results and manuals.
  2. Final pack when the last documents arrive: the MCS certificate, the building regulations certificate and the network operator proof. These often lag the install by days or weeks.

Under MCS:2025 there is a deadline for giving the customer these key documents after completion. Check the current deadline for your track and diarise it the day you commission.

Stop incomplete packs going out

  • Build the pack from the job file, not from a blank template. Anything copied by hand is a chance to copy the last job.
  • Do not send the final pack until the certificate references exist. "To follow" in a pack is a promise nobody tracks.
  • Keep assessor evidence separate. Roof photos and internal notes belong in your job file, not the customer's pack.
  • Record when and how the pack was given, so you can prove it later.

How Voltfile helps

Voltfile builds the handover pack from the evidence on the job, with your logo and contact details. Technical handover unlocks when every required technical item is filed. The final pack waits for the certificates and network operator proof, and the Home screen shows the deadline. The homeowner gets a copy in their portal. Battery jobs get their own items and certificate clock: see battery installation paperwork.

Voltfile does not raise the MCS certificate or declare the installation meets a standard. Your Technical Supervisor does.

Official sources

Always check the current version before relying on a date, a threshold or a form.

Free: the handover evidence checklist

A printable one-page-per-job PDF, from survey to final pack.

Get the checklist

More guides

See your next handover pack come together

Start a free trial, or book a 20-minute call and we will walk through a real job file with you.