Construction phase plans and signing

Prepare a construction phase plan for a job from your template, and collect signatures.

  • Last reviewed

Every job gets its own construction phase plan, built from the job's details, a short site-details form and your company's template. The install stage stays locked until the plan is issued and at least one person has signed it.

Steps: prepare and issue the plan

  1. Open the job. The plan banner shows Start the plan or Finish the plan.
  2. Fill in the site details: dates, the person in charge, welfare, parking and storage, the isolation point, roof access, scaffold, edge protection, fragile surfaces, the asbestos check, battery location and lifting, the first aider, nearest A and E, and the assembly point. Questions only appear when they apply, such as scaffold details for a scaffold or tower.
  3. Leave out any hazard that does not apply, with a reason, and add site-specific hazards.
  4. Pick subcontractors from your records.
  5. Issue the plan. Issuing takes a snapshot, so later template edits never change it.

Steps: sign on

  1. On site, open the plan and press Read and sign.
  2. Each person reads the sections, enters their name, role and company if they are a subcontractor, signs with a finger and confirms they have read and understood it.
  3. Location is optional and only taken when they tap the button.
  4. One phone can collect signatures from several people.

Daily checks and toolbox talks

The plan page also has the daily pre-start check (eight yes, no or not applicable questions, with a note needed for any No) and toolbox talks with attendees and optional signatures. Signatures, checks and talks cannot be edited afterwards, and their times come from the server.

Changing an issued plan

Changing the plan takes it back to draft and locks the install stage again. Issuing it again creates a new version that needs new signatures.

Your template

Admins and office staff edit the company template under Plan template. You can edit, switch off, add or reset sections, hazards and method statements, and choose when each applies: every job, PV, battery, work at height, scaffold, fragile surfaces or asbestos.

Good to know

  • The plan PDF is in your branding and is included in the assessor pack.
  • On Pro and above, with the AI assistant switched on, Draft with the AI assistant suggests site arrangements and hazards for you to accept or change. Names, dates, the first aider and A and E are never drafted.
  • The starting wording was written for this product. Review it with whoever advises you on health and safety.